LDCWater Resources MCQs

Practice 20 free water resources multiple choice questions for LDC exam. Instant answers with explanations in Hindi and English.

Master Water Resources under Geography of Rajasthan for LDC with our curated MCQ set. Every question follows real Rajasthan exam patterns. Switch between Hindi and English anytime.

LDC — Geography of Rajasthan — Water Resources

20 Questions • Instant results & explanations • Hindi & English

0 / 20
Question 1 of 20

Which dam was primarily constructed to maintain the water supply for the Indira Gandhi Canal Project during the winter season?

Question 2 of 20

Which of the following districts of Rajasthan rank first and second respectively in terms of irrigation carried out by ponds?

Question 3 of 20

What is the physical length of the Mahi Bajaj Sagar Dam, making it the longest dam in Rajasthan?

Question 4 of 20

Consider the following statements regarding the water resources of Rajasthan: 1. Rajasthan possesses 1.72% of India's total surface water. 2. The state's share in India's total groundwater exploitation is 1.16%. 3. Geographically, Rajasthan is the largest state in India. Which of the statements given above is/are correct?

Question 5 of 20

Which of the following states is NOT a beneficiary of the drinking water supplied by the Govind Sagar reservoir built behind the Bhakra Dam?

Question 6 of 20

Among the eight designated lift irrigation schemes on the Chambal Right Main Canal, which one is geographically located in 'Chakhanabad' within the Baran district?

Question 7 of 20

Consider the following pairs of Chambal lift irrigation schemes and their corresponding districts: 1. Panchnel Lift Scheme - Baran 2. Jalipura Lift Scheme - Kota 3. Kachhari Lift Scheme - Kota 4. Sorkhand Lift Scheme - Baran Which of the pairs given above are correctly matched?

Question 8 of 20

What is the precise financial and water allocation share of Rajasthan in the Bhakra Nangal multi-purpose project?

Question 9 of 20

According to the Eradi Commission formed in 1986, what specific volume of water was legally allocated to Rajasthan from the Ravi-Beas river system?

Question 10 of 20

Consider the following statements regarding the Jawahar Sagar Dam: I. It was constructed in 1972 as a pickup dam on the border of Bundi and Kota. II. It generates 172 MW of hydroelectricity. III. Its structural dimensions are 45 meters in height and 39 meters in length. Which of the above statements is/are correct?

Question 11 of 20

Consider the following statements regarding the water resources and geographic profile of Rajasthan: 1. It possesses only 1.16% of the total surface water available in India. 2. The state's share in the national groundwater exploitation is 1.72%. 3. Canals are the primary source of irrigation, covering the largest irrigated area in the state. Which of the statements given above are correct?

Question 12 of 20

Match List-I (Rivers) with List-II (Associated Projects) and select the correct answer: List-I P. Giri River Q. Mahi River List-II 1. Renukaji Multipurpose Project 2. Kadana Dam 3. Jawai Dam

Question 13 of 20

Match List I (Canal Name) with List II (Extraction Point) and select the correct answer: List I A. Bisht Canal B. Bhakra Canal List II i. Nangal Dam ii. Ropar Headworks below Nangal Dam iii. Govind Sagar Reservoir

Question 14 of 20

The Anta Lift Scheme is designed to provide irrigation benefits to which specific district?

Question 15 of 20

With reference to the Bhakra Nangal project's structural layout, match the canal with its precise geographical origin: List I (Canal) A. Bisht Canal B. Bhakra Canal List II (Origin) i. Sutlej river at Ropar Headworks ii. Beas river at Harike Barrage iii. Sutlej river at Nangal Dam

Question 16 of 20

What is the total length of the Left Main Canal originating from the Kota Barrage?

Question 17 of 20

Which of the following statements regarding the Beas Project is/are correct? 1. It is a joint river project of Punjab, Rajasthan, and Haryana. 2. The project integrates the water systems of the Sutlej, Ravi, and Beas rivers. 3. It was constructed exclusively to provide drinking water to Himachal Pradesh. Select the correct answer using the codes given below:

Question 18 of 20

Which political agreement led to the formation of the Eradi Commission in 1986 to resolve the Ravi-Beas river water dispute?

Question 19 of 20

Consider the following pairs of Chambal project canals and their respective lengths: 1. Left Main Canal - 259 km 2. Right Main Canal (in Rajasthan) - 124 km Which of the pairs given above is/are correctly matched?

Question 20 of 20

Which of the following lift irrigation schemes originates from the Right Main Canal of the Chambal River and is geographically located in the Kota district?

More Geography of Rajasthan Subtopics

Practice other subtopics under Geography of Rajasthan to strengthen your LDC preparation.